Question: What Is A Punch List In Construction?

Why is a punch list called a punch list?

The phrase takes its name, under one hypothesis, from the historical process of punching a hole in the margin of the document, next to one of the items on the list. This indicated that the work was completed for that particular construction task.

What is punch list process?

A punch list is part of the project closeout portion of the construction process in which a contractor prepares a document that lists any work that has not been completed, or not been completed correctly.

What should I look for in a punch list?

Top 15 Most Common Punch List Items

  • Appliances are working correctly & fully functional.
  • Cabinet doors and drawers are opening & closing smoothly and without any problems.
  • Doors open and close properly & sealed tightly.
  • Floors are damage free from construction.
  • Hardware (hinges, locks, latches) work fluently.

What is construction punch out?

Punch out work in construction is a quality control job. It will include a variety of jobs that need to be done before the project is considered finished. The punch out person will determine what repairs are needed and conduct them.

You might be interested:  Readers ask: What Is A Construction Schedule?

What is the punch?

1: the action of punching. 2: a quick blow with or as if with the fist. 3: effective energy or forcefulness a story that packs a punch political punch.

What is a punch walk?

A punch list is a list of tasks and items that need to be fixed or completed before a construction project can be considered finished. To ensure the best review process, the contractor, subcontractor, owner, and architect should all walk through the project together.

What is a punch list example?

Examples of punch list items include: repair broken window. replace stained wallboard. repair cracked paving.

Is punch list one word?

A punch list is an accounting of incomplete or poorly executed items on a construction project. Punch list is primarily an American term, sometimes the hyphenated punchlist is found.

WHO issues change orders?

7.2. 1 ” A change order is written instrument prepared by the architect and signed by the owner, contractor, and architect”

How do you make a punch list?

How To ensure a Punch List is completed:

  1. Be present near the end of the project. Inspect the work. Ask questions.
  2. Consult. Have an eye for detail. Be prepared and helpful.
  3. Get it done. Follow-up. Communicate changes in scope.
  4. Design Intent. Confirm what was built.

What is a punch list in real estate?

A punch list is a record of things that need to be fixed by the contractor or seller before the buyer takes possession of a property.

What is a punch list quizlet?

Punch List – Definition. A list of items that need to be fixed before project is considered complete. Punch List – Common Uses/Types/Reasons. • Performed at the end of the project to identify remaining issues. • Typically consists of minor and aesthetic issues (dings and scratches on the walls)

You might be interested:  How To Start My Own Construction Company?

What is a punch out guy?

Punchout technicians are responsible for repairs to newly constructed homes or commercial buildings as part of final quality control activities. After the punch list is created, the punchout technician reviews it to determine what repairs are needed. An eye for detail is important for anyone assigned to this role.

What does punched out mean?

Definition of punch out (Entry 2 of 2) intransitive verb. 1: to record the time of one’s stopping work or departure by punching a time clock. 2: to bail out of an aircraft using an ejection seat. transitive verb.

What is considered construction?

OSHA’s regulations define “construction work” as “construction, alteration, and/or repair, including painting and decorating.” at 29 CFR 1926.32(g) and 29 CFR 1910.12(b). (1) all types of work done on a particular building or work at the site thereof * * * 29 CFR 5.2(i) and (j).