What is a quantity takeoff in construction?

Explaining what a quantity takeoff is in construction is relatively straightforward. Essentially, a quantity takeoff refers to estimating materials. You review the project plans and take off information about what physical materials the architect, engineer or draftsperson specifies to assemble the project.

What is a concrete takeoff?

When it comes to concrete takeoff and concrete estimating, this includes studying every factor of a construction project that involves concrete. For instance, you need to calculate how much concrete will be needed, as well as the amounts of other materials such as rebar and reinforcing mesh.

What is an area takeoff?

Area takeoff is anything quantified with a ‘square’ measurement. Things like carpeting, roofing, flooring, concrete and ceiling tile are examples of items you would takeoff as area. Not only can you determine square footage, but you can also determine volume – handy for taking off concrete!

What is a take off in quantity surveying?

The term ‘taking off‘ refers to the process of identifying elements of construction works that can be measured and priced. Analysis of drawings and specifications allows the cost consultant (usually a quantity surveyor) to prepare a taking off list, which lists all of the individual elements that comprise the works.

You might be interested:  Quick Answer: How To Get Into Construction Work?

What is unit cost in construction?

Under a unit price contract, the contractor provides the owner with a specific price for one or more tasks or a partial “segment” or a “block” of the overall work that’s required on the project. The owner then agrees to pay the contractor for the units that the contractor expends to complete the project.

What is the best estimating software for construction?

The Best Construction Estimating Software

  • ProEst Estimating Software (Best Overall)
  • Stack (Best for Estimating & Takeoff)
  • Clear Estimates (Best for Small Contractors)
  • Sage Estimating (Best for Large Enterprises)
  • Sigma Estimates (Best for Windows)
  • simPRO Estimating Software (Runner-up)

How do you figure up concrete?

How to calculate concrete:

  1. Determine how thick you want the concrete.
  2. Measure the length and width that you’d like to cover.
  3. Multiply the length by the width to determine square footage.
  4. Convert the thickness from inches to feet.
  5. Multiply the thickness in feet by the square footage to determine cubic feet.

How do you remove concrete?

Steps for Removing a Concrete Slab

  1. Step 1: Create a Void Under the Concrete. The best way to speed up concrete removal is to create a void underneath the section of slab you’re working on.
  2. Step 2: It’s Hammer Time.
  3. Step 3: Pull Apart and Remove the Broken Concrete.
  4. Step 4: Repeat Steps Until Concrete Is Demolished.

What is the best takeoff software?

  • Esticom. Esticom is a cloud-based construction takeoff and estimating platform that helps contractors manage construction projects with real-time access to labor, pricing, plans and material database.
  • PlanSwift.
  • STACK.
  • McCormick Electrical Estimating.
  • Accubid Anywhere.
  • Stratosphere.
  • InSite SiteWork.
  • EarthWorks.
You might be interested:  How To Become A Certified Construction Manager?

What is a takeoff in HVAC?

Duct takeoffs have big shoes to fill. They are the avenue by which air moves from the main duct pipe to a new branch. It could have something to do with your duct takeoffs.

What is takeoff estimate?

The phrase “takeoff” refers to the estimator taking each of the required materials off a project’s blueprint. The sum of the cost of materials provides a total material cost for the project, which is then factored into the final construction cost estimate.

What is a takeoff?

In construction, a “takeoff” is the process of determining how much of each material is needed to complete a job. It is also sometimes called a quantity takeoff or material takeoff and sometimes you’ll see it hyphenated as “take-off”.

How do you prepare a bill of quantities?

Basic Format for preparing BOQ

The main sections included in the bill of quantities are Form of Tender, Information, Requirements, Pricing schedule, Provisional sums, and Day works. For the preparation of BOQ, 5 main components are to be considered which are as follows: Item Description. Unit.

What is quantification in construction?

The transformation of drawn information into descriptions and quantities, undertaken to value, cost and price construction work.